We’ve reached our double century – 200 days in and still not finished!
However, our floor is now partially tiled.
Here’s a “before” shot:
And two “after” shots:
We’ve reached our double century – 200 days in and still not finished!
However, our floor is now partially tiled.
Here’s a “before” shot:
And two “after” shots:
Filed under House
After a few days’ wait, the roof tiles have arrived and the roofers have done one side of the roof. Looking much more like a finished house now! And all the Velux windows were installed, after reshuffling the ones at the back slightly downwards.
Filed under House